KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  10-24-2008
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Cleaned Fuselage/Drilled Fuselage for Conduit

Using lacquer thinner, wiped off underside of fuselage at location of all antennas and strobe power supply brackets. Measured down 1'' from longeron and drilled 1/4'' holes in F-605 and XX for static line. Used Unibit to drill 1/2'' holes in Xx and Xx between baggage and aft seat ribs for split plastic conduit. Conduit will be used to run wire from aft baggage area forward. Installed control rod between control column and elevator bellcrank. Found that the weldment on the control column interferes with the full movement of the control rod. Started to file part of the weldment away.

Need to scuff and prime rivet areas.
' style=

Conduit in Fuselage

Conduit in Fuselage

' style=

Left Aft Ends of Conduit

Left Aft Ends of Conduit

' style=

Right Aft Ends of Conduit

Right Aft Ends of Conduit

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.