KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  10-23-2008
Number of Hours:  4.00
Manual Reference:  
Brief Description:  MB Bracket Drilled into Fuselage

Used bandsaw to cut out doubler plate for the marker beacon antenna. Cleaned up edges using the Scotchbrite wheel. Used the bending brake to put flanges on the MB doubler plate. Drilled pilot holes in marker beacon antenna bracket. Drilled bracket to skin in left bay aft of the baggage bulkhead. Drilled the bracket to the skin with #40 bit. These holes will be dimpled. Drilled the holes for the BNC connector up to 1/2'' with the Unibit and the other two holes to 5/32'' and 7/32''. Cut angles off antenna bracket flanges and smoothed edges.
' style=

Marker Beacon Antenna Bracket in Fuselage

Marker Beacon Antenna Bracket in Fuselage

' style=

MB Bracket and Strobe Power Supply in Fuselage

MB Bracket and Strobe Power Supply in Fuselage

' style=

Brackets' Flanges Trimmed

Brackets' Flanges Trimmed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.