KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  10-2-2008
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Installed Nutplates on EF-601 Channel

Clecoed flap side covers to EF-601 and drilled holes from #30 to #19. Deburred all holes and drilled #40 holes for nutplates using nutplate jig. Drilled an access hole in the left F-605 cover for the AN4 bolthead. Used pneumatic squeezer to rivet nutplates to EF-601 channel. Installed flap motor in the channel.

Measured and drilled pilot holes in the F-605 bulkheads for the AN3 bolts attaching the flap bearing blocks. These holes were then drilled up to size.
' style=

Left Flap Side Cover Fitted to EF-601 Channel

Left Flap Side Cover Fitted to EF-601 Channel

' style=

Hole cut out of Flap Side Cover for Flap Motor Bolt

Hole cut out of Flap Side Cover for Flap Motor Bolt

' style=

Flap Motor Bolted in Place

Flap Motor Bolted in Place

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.