KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  11-29-2007
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Primed/Riveted Elevator Bellcrank

Reviewed Van's plans/instructions and compared them to the quickbuild fuselage. Cleaned the elevator bellcrank components with enamel cleaner and primed everything. Riveted everything together with pneumatic squeezer. Drilled second hole for elevator bellcrank bolt thru channel F-628.
' style=

Elevator Bellcrank Primed and Riveted

Elevator Bellcrank Primed and Riveted

' style=

Elevator Bellcrank Drilled and Placed in Position

Elevator Bellcrank Drilled and Placed in Position

' style=

Elevator Bellcrank in Position

Elevator Bellcrank in Position

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.