Powered By Kitlog Pro v2.0
Greggs RV-4
RV-4
All
1-21-2012
< Previous Log Entry
Next Log Entry >
Date:
1-21-2012
Number of Hours:
1.00
Manual Reference:
Brief Description:
Fabricating Aileron Bellcranks
Spent an easy hour fabricating the aileron bellcrank brackets and spacers that go between them. Drilled all holes, and flange bearings were cleaned and checked. All compontents are ready for deburr and prime.
Holes drilled, and spacers fabricated
Bellcranks clecoed together with spacers
Ready to scuff and prime
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-4 Home
Category
# Logs
# Hours
All
206
582
Ailerons
14
29
Empennage
51
159
Fuselage
67
196
Wings
74
198
Copyright © 2001-2024 Matronics. All Rights Reserved.