KitLog pro

Powered By Kitlog Pro v2.0

Daves Web Site
' style=
Date:  8-9-2017
Number of Hours:  5.00
Manual Reference:  no ref
Brief Description:  Oil Heater 35 Side jobs

Here are a few jobs that happen along the way.

As I mucked up the first go at poisioning the Andair valve in its correct rotation here's the second attempt after filling and recutting the inlay hole.

Pic 2 is after some fun getting a working cable mounting system for the trap door on/off. You might notice I've also done more work on the box getting the edges to seal better. I spent hours fiddling with that thing.

Pic 3 is a shot of my pipe making process. I put plastic pipe on my rotisserie, glass it with prepreg or foil based layups and peel ply the outside which for once is easy.
' style=

Repositioned valve

Repositioned valve

' style=

Cable clamping

Cable clamping

' style=

Pipe making

Pipe making

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.