KitLog pro

Powered By Kitlog Pro v2.0

Daves Web Site
' style=
Date:  8-23-2017
Number of Hours:  3.00
Manual Reference:  no ref
Brief Description:  Fuel System - Getting those Ducks in a Row 1

This is really fuel system and Chapter 21 although I have the pics in the heater folder. Oh well.

I'm doing high pressure fuel injection as you know. My plan of placing the on/off valve, dual pumps and then post pump filter is coming together. It ahs been challenging to make the best use of the little space I have in this plane.

I want these items as near to the common sump wall as possible to maximise the GIB leg room.

The item that was the most promenent turned out to be the mounting of the post filter. The solution has been to inlay an area in the sump wall for mounting its adel clamp. These pics are really how I layed it all out. You can see I've done some work in the foam.
' style=

Indent for the fuel filter

Indent for the fuel filter

' style=

In place

In place

' style=

Test fitting

Test fitting

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.