KitLog pro

Powered By Kitlog Pro v2.0

Daves Web Site
' style=
Date:  5-24-2017
Number of Hours:  4.00
Manual Reference:  no ref
Brief Description:  Sump Top Inside layup

Yesterday was 2 plys of BID on the bottom of the common sump top or 'lid'. A few logs ago I was saying how it is tough to get a really nice layup on very slightly imperfect foam.

Well this top piece is still pristine and so the layup on this nice flat service is really really good. Pic 1 is the usual preparations. The piece is taped down, eveything is clean and the glass is cut and tapped to size.

Pic 2 is after the layup and peel ply. No lumps or areas of tiny voids. Pic 3 after an edge clean up of a very well glassed piece.

I think in future I need to either hardshell or spend huge amounts of time getting the surface perfect as if I was doing a top coat. ...or I could just live with the minor imperfections. Only you reading this would know ;)
' style=

Prepped

Prepped

' style=

Glassed

Glassed

' style=

Cleaned up

Cleaned up

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.