Date:  6-4-2016
Number of Hours:  10.00
Manual Reference:  Roncz B or C
Brief Description:  Canard hangar position fix 1

Opps. When I went to cut out the fuselage sides for the elevator tubes I eventually noticed that the rotation part of the tubes was in the wrong place. I had moved the plans position for these Cozy fittings thinking that this way I could hide the bolts where the tube is connected to the elevators.

Wow I got that wrong!! ...and it took 4 days full time to fix. I've done this in two log entries and under stated the hours at 5 per day HA!

The inboard elevator hangars had to be removed, the elevator tubes shortened and the hangars re installed. Pic 1 shows that I've clamped a heavy duty soldering iron to a hangar and once it was pretty hot, I dug out some flox around it and after a while got the hangar out without damaging anything.

Pic two shows I've filled up the old slots with micro. The new hard points are microed in per plans. Oh and I alodined the hangars to reduce corrosion and increase adhesion to the flox.

Pic 3 has a couple of plys of BID over the top as this step is usually done before skinning the bottom of the canard.
' style=

Removing a hangar

Removing a hangar

' style=

New hard points

New hard points

' style=

Cleaned up and BID covering

Cleaned up and BID covering