Date:  4-14-2016
Number of Hours:  5.00
Manual Reference:  13-1
Brief Description:  Nose gear box 3

I kept adding pieces until I had my box as you see in pic 1. At this stage it was 5 mt glued together with the BID on the inside.

Pic 2 shows that I've now added 2 ply BID tapes 1.2" wide to all the corners. I should probably have just used 1 ply here. Its very strong. I did that the previous night after a long day on the build.

Pic 3 shows that I've sorted out where the screws will go and floxed little hardpoints into the foam. These were some thick leftover layups I'd make a while ago. I was hoping to use Garalite but my order is taking forever to get sorted out so I'm just going ahead without it.

I've also done a one ply BID layup over the top of this. I'll do the other side tomorrow. I guess I could have done both together but this will ensure everything stays put for the cure and I have been working on the seat while doing this.
' style=

Box in place

Box in place

' style=

Inside tapes

Inside tapes

' style=

Outer ply with hard points

Outer ply with hard points

' style=