KitLog pro

Powered By Kitlog Pro v2.0

Daves Web Site
' style=
Date:  12-23-2014
Number of Hours:  10.00
Manual Reference:  Roncz B sheet
Brief Description:  Trial Elevator setup 4

I had to be getting closer...right? After I realised I had to remove the jigs to check the down elevator I cleaned off the glue residue and used weights instead for the rest of the setting up. Much more efficient. I tried a few different ways of holding the hinges in place too.

Several times I cleaned the 5mt glue out of the slots so I could have a fresh go of setting the elevators. For some reason I was having a LOT of trouble getting the required elevator range and canard cove or slot gap at the same time. None of this was a discussion, I just had to get it right somehow.

I guess today is not the day I get it done, but I was getting closer than when I started and understanding what was required was in the bag... I just needed to do it.
' style=

Jigs and weights

Jigs and weights

' style=

Checking the angles

Checking the angles

' style=

Jig placed per plans

Jig placed per plans

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.