KitLog pro

Powered By Kitlog Pro v2.0

Daves Web Site
' style=
Date:  2-27-2014
Number of Hours:  10.00
Manual Reference:  14-3
Brief Description:  Cured top cap clean up

Once cured I had to remove the side dam. This took a few hours and more work is still to be done to get the cap smooth on top, matching the remaining foam and having a nice rounded edge ready for the outer shear web.

For now it was great to see a perfect looking piece of fibreglass that seems more like a metal beam. As you can see in pic 3 it just looks like a solid mass.

It was also surprising how much heavier the spar is to pic up.... which makes sense remembering all that resin that we put in. It is amazing to think the wings are going to be bolted to this structure.
' style=

Cured top cap

Cured top cap

' style=

Cleaning up

Cleaning up

' style=

No visible air

No visible air

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.