KitLog pro

Powered By Kitlog Pro v2.0

Daves Web Site
' style=
Date:  9-28-2013
Number of Hours:  10.00
Manual Reference:  14-2
Brief Description:  Inside Spar Prep

Time for some pre work. Once one side of the inner bulkheads had a ply of BID, the other side and the ends needed the layups done in one go per section.

The first pic is a little structure so I could put a 5lb weight on the hardpoints. I made two and divided up the layups into the outside ones first which have two metal points. Then later I did the inside.

The next pics show how I did the glass shapes for these awkward places. Just starting with paper I work out how to get the glass where I want it and then its drawn up on foil. Glass with the correct bias angle is cut oversize and then I'm ready.
' style=

Hard point weight holder

Hard point weight holder

' style=

Inner bulkhead shapes

Inner bulkhead shapes

' style=

Inner bulkhead BID

Inner bulkhead BID

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.