KitLog pro

Powered By Kitlog Pro v2.0

Daves Web Site
' style=
Date:  7-8-2013
Number of Hours:  10.00
Manual Reference:  9-3
Brief Description:  Inboard Axle wedges

Now the axles are in place soon the bolts will go in. There is an issue of ensuring the clamping of the axle is parallel. As you can see in the first pic there is quite a curve on the inboard side of where the bolts and then nuts will go.

I want even clamping pressure so around 80 plys of bid, 40 a side or about .4" were needed to build that area up ready to be routed parallel so I can achieve even clamping.

Bit of a job and you can see the two sides set up in the next two pics. I again used the teta (high TG) resin as a guard against hi temp braking situations in that area.
' style=

Required wedge angle

Required wedge angle

' style=

Right inboard wedge

Right inboard wedge

' style=

Left inboard wedge

Left inboard wedge

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.