Date:  8-1-2012
Number of Hours:  10.00
Manual Reference:  6-5
Brief Description:  Remove Floor

The floor took over a month and had a lot of expensive parts. However I was unhappy with it as there was air in the layup. This was a non structural fault. It was caused by making the slops on the cutouts too sudden a transition to lowest points. It should or could have been much more gradual.

After all the taping work and doing a repair I decided to cut it out. This took many days as I was very careful and the last pic is 18 days later all ready to go again.

Foam for the floor had to be made and brouht in from China so I was in for at least a months delay.

I am committed to the best work I can do without going overboard. This time self imposed quality control required I redo this part. I'm happy with the decision and will do the next floor with alterations.

In the mean time I went on with other tasks and now have the rear seat sump and fuel system roughed out in my head having studied lots of options.
' style=

Removing the floor

Removing the floor

' style=

Lots of clean up

Lots of clean up

' style=

Back to a fresh start.

Back to a fresh start.