Spent some time setting up the gluing proceedure for the lower triangular longeron. As well as a dry clamping session I pre drilled the 2mm holes for nails that assist getting things in place per plans.
After removing the local peel ply and sanding all surfaces I used pure epoxy with a brush and then wet flox to join. The clamps also clamped onto the sides of the workbench. The hardest part was getting all the excess off otherwise a very easy job after all that prep work.