KitLog pro

Powered By Kitlog Pro v2.0

Daves Web Site
' style=
Date:  2-5-2012
Number of Hours:  10.00
Manual Reference:  5-2
Brief Description:  Inside Fuselage layup

First Micro slurry the entire side. Takes a while as most of the micro is scrapped off. Just enough left to fill the foam and give the glass a bed.

Then very carefully laying out the glass with the bias at 30 degrees and all the fibres very straight. This takes quite a while.

Once straight and everything lined up I begin wetting out.
' style=

Ready for micro

Ready for micro

' style=

Glass layed out, fibers correct

Glass layed out, fibers correct

' style=

Wetting things out

Wetting things out

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.