KitLog pro

Powered By Kitlog Pro v2.0

Daves Web Site
' style=
Date:  1-2-2012
Number of Hours:  10.00
Manual Reference:  4-2, 4-3
Brief Description:  F22 and Firewall

Started cleaning up F22. I originally cut out holes in the foam. Then was worried about the glass on the edges drooping so I made foam inserts. It just made a lot more work. All I needed to do was just glass over everything and cut it out later OR deal with the glass buy trimming while it was wet. I was worried about the fibres getting out of alignment although the plans say firbe orientation is not critical here. I still did all the BID at 45 degrees.

Took quite a while to clean up the edges.

The firewall was out of 1/4" quality birch ply. Easy to cut to shap and 1 ply of bid. I did slurry the wood first but it needed very little and I think this serves to prep the surface and get a bit of resin on it before the glass. Worth doing.
' style=

F22 cleaning up

F22 cleaning up

' style=

Firewall

Firewall

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.