KitLog pro

Powered By Kitlog Pro v2.0

Daves Web Site
' style=
Date:  12-24-2011
Number of Hours:  10.00
Manual Reference:  4-2
Brief Description:  F22 Aft face

F22 prep then aft face with 2 ply of BID and doubler pressed into place while wet. Then further plys per plans locally over the doubler. Lower edge transitions were peel plyed.

I used weights for the cure. Probably not necessary. There is a concern about warping but this is often when external heat is applied and my room was hot enough at 27C.
' style=

F22 prep and IP prep

F22 prep and IP prep

' style=

F22 with doubler

F22 with doubler

' style=

F22 during cure with weights

F22 during cure with weights

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.