KitLog pro

Powered By Kitlog Pro v2.0

Edwards Web Site
' style=
Date:  4-1-2023
Number of Hours:  9.50
Manual Reference:  
Brief Description:  Fabricated the front wheel fairing

Fabricated the front gear and wheel fairings from the fibergalss parts. Trimmed the wheel opening to allow 5/8 inch clearance all around. A lot of fitting, triming and refitting steps to get everything to fit together well. Epoxy/cotton flox mixture was used to reinforce the attachment points to the gear leg.
' style=

Front view

Front view

' style=

Right side view

Right side view

' style=

Left side view

Left side view

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.