Work Logs Found: 233
Category Work Time: 1304 Hours
 Date
Hours
Work Log Summary

Details

 03-22-2024
8.50
Wing root fairings
Details
       

 03-16-2024
25.00
Finished closeout of the bottom wing skins
Details
       

 03-08-2024
4.00
Final prep. of pitot wiring and tubing before wing
Details
       

 02-21-2024
5.00
Completed SB-00043
Details
       

 02-17-2024
6.00
Moved fuselage to the hangar
Details
       

 10-06-2023
8.00
Started running the electrical wires through the l
Details
       

 09-09-2023
6.00
Installed the emergency canopy eject system
Details
       

 09-07-2023
7.00
Completde buss manager installation and engine mon
Details
       

 07-22-2023
12.50
Fitted the wingtips and installed the NAV antenna
Details
       

 07-21-2023
11.00
Installed the control cables
Details
       

 07-03-2023
4.00
Deburred and primed/painted several misc. parts.
Details
       

 07-02-2023
5.00
Fitted the wingtip lenses
Details
       

 06-25-2023
4.00
Deburred and primed miscelaneous floor panels
Details
       

 06-24-2023
10.00
Finished assembly and mounting of FLYLED wingtip l
Details
       

 06-16-2023
8.00
Prepared to move wings and hor stab to hangar spac
Details
       

 05-10-2023
4.00
Cowling test fitting
Details
       

 05-09-2023
7.50
Added rubber sealing strips to intakes on bottom c
Details
       

 05-08-2023
6.00
Added rubber seal strips to the engine baffles
Details
       

 05-04-2023
7.00
Installed air intake snorkle
Details
       

 04-28-2023
7.00
Installed baffle assemblies to the engine
Details
       

 04-20-2023
7.00
Continued assembling the engine baffles
Details
       

 04-17-2023
2.00
Added RTV strips to rear baffle components
Details
       

 04-15-2023
6.50
Started fabriaction of engine baffles
Details
       

 04-06-2023
5.00
Added bottom cowl close-out piece
Details
       

 04-01-2023
9.50
Fabricated the front wheel fairing
Details
       

 03-17-2023
7.00
Added oil access door to top cowling
Details
       

 03-09-2023
9.00
Continued cowling work
Details
       

 02-24-2023
16.00
Continuation of fitting the cowling
Details
       

 01-23-2023
20.00
Fitting the cowling
Details
       

 01-02-2023
4.00
Installed alternator and spinner plate fixture
Details
       

 12-20-2022
6.00
Prepared spinner
Details
       

 12-10-2022
5.00
Installed engine
Details
       

 12-09-2022
7.00
Unboxed engine and prepared for mounting
Details
       

 12-01-2022
6.50
Added items to front of firewall
Details
       

 11-03-2022
6.00
Assembled cooling flap assembly
Details
       

 11-01-2022
6.00
Assembled and attached front landing gear
Details
       

 10-14-2022
4.00
Attached engine mount and cleaned up some wiring.
Details
       

 10-08-2022
6.00
Reinstalled instruments and 1st power test.
Details
       

 10-03-2022
4.00
Started the FlyEFII Bus Manager Installation
Details
       

 10-02-2022
2.50
Fabricated GPS antenna mount doubler
Details
       

 10-01-2022
60.00
Nearly finished with wiring
Details
       

 05-31-2022
1.00
test

 05-30-2022
12.00
Continued landing gear and wheel fairing fitting
Details
       

 05-13-2022
10.00
Started gear and wheel fairing fitting
Details
       

 05-05-2022
12.00
Main Landing gear installation
Details
       

 04-02-2022
48.00
Avionics wiring harness
Details
       

 02-07-2022
12.00
Designed and assembled center circuit breaker pane
Details
       

 01-10-2022
10.00
Installing misc avionics components
Details
       

 01-07-2022
6.00
Additional panel work
Details
       

 01-03-2022
4.00
Preliminary seat design
Details
       

 12-30-2021
9.00
Instrument Panel Work
Details
       

 10-20-2021
3.00
Received engine from Lycoming
Details
       

 10-18-2021
12.00
Started instrument panel design and fabrication
Details
       

 10-16-2021
6.00
Prepared landing gear components
Details
       

 09-27-2021
8.00
Seat frame assembly and start of top forward skin
Details
       

 09-17-2021
3.00
Final fitting of canopy
Details
       

 09-15-2021
14.00
Finished build up of fiberglass transition of cano
Details
       

 08-30-2021
4.00
Added dyed fiberclass strips to the canopy skin jo
Details
       

 08-28-2021
4.00
Added Epoxy/microballoon filler to canopy/fuse joi
Details
       

 08-18-2021
9.00
Fitting the canopy to the frame
Details
       

 08-15-2021
6.00
Built and mounted fuselage on a rotisserie
Details
       

 08-13-2021
5.00
Assembling and test fitting canopy frame
Details
       

 08-06-2021
5.00
Continued assembly of the canopy frame
Details
       

 07-24-2021
6.00
Putting together the forward part of the canopy fr
Details
       

 06-24-2021
5.00
Preparing parts for forward canopy frame
Details
       

 06-21-2021
4.00
Added access panels for access to subpanel
Details
       

 06-19-2021
4.00
Installed canopy latching mechanism
Details
       

 06-18-2021
7.00
Rear window fitted
Details
       

 06-17-2021
5.00
Added subpanel and main panel assemblies
Details
       

 06-15-2021
6.00
Painted interior, Added pitch AP servo
Details
       

 06-02-2021
7.00
Installed rudder/brake pedals and flap motor
Details
       

 05-30-2021
9.00
Fuel lines in fuselage
Details
       

 05-23-2021
5.00
More soundproofing
Details
       

 05-19-2021
6.00
Added soundproofing and baggage area floor
Details
       

 04-11-2021
5.00
Assembled the roll-over bar
Details
       

 04-06-2021
7.00
Roll over bar prep.
Details
       

 03-28-2021
5.00
Elevator push/pull rods and bellcrank
Details
       

 03-26-2021
4.00
Forward fuselage parts
Details
       

 03-16-2021
3.00
Assembled subpanel components
Details
       

 03-08-2021
4.00
Preparing subpannel parts
Details
       

 02-27-2021
5.00
Fitted firewall insulation and added master cylind
Details
       

 02-23-2021
2.50
Assembled rudder pedals
Details
       

 02-21-2021
9.00
Preparing inner deck and rudder pedal parts
Details
       

 02-15-2021
6.00
Attached empanage to fuselage
Details
       

 02-03-2021
4.00
Preparing to join fuselage to empanage
Details
       

 01-23-2021
5.00
Installed seat back suport rail assembly
Details
       

 01-03-2021
7.50
Riveted right side fuselage skin
Details
       

 12-20-2020
7.00
Prepared the right side fuselage skin
Details
       

 12-06-2020
8.00
Riveted left side fuselage skin
Details
       

 11-28-2020
6.00
Continued preparing fuselage parts that attach to
Details
       

 11-24-2020
5.00
Preparing left side fuselage skin and components
Details
       

 11-19-2020
4.00
Preparing for side skin attach
Details
       

 11-17-2020
4.00
Prepared upper and lower longerons
Details
       

 11-08-2020
7.00
Connecting mid fuselage to firewall section
Details
       

 10-23-2020
6.00
Joined 2 parts of lower fuselage
Details
       

 10-11-2020
5.00
Finished firewall section of the plans...
Details
       

 10-09-2020
3.00
Forward bottom fuselage
Details
       

 10-05-2020
7.00
Firewall continued
Details
       

 10-03-2020
4.00
Firewall continued
Details
       

 10-01-2020
2.50
Firewall continued
Details
       

 09-29-2020
3.00
Firewall continued
Details
       

 09-27-2020
5.00
More firewall parts
Details
       

 09-25-2020
3.50
Prepared parts for the firewall tunnel assembly
Details
       

 09-24-2020
5.00
Firewall Parts prepped and assembed
Details
       

 09-21-2020
3.50
Mid fuse bottom skin is on
Details
       

 09-11-2020
1.50
Mid fuselage continued
Details
       

 09-10-2020
1.50
Mid fuselage continued
Details
       

 09-09-2020
5.00
Mid fuselage continued
Details
       

 09-05-2020
3.00
Mid fuselage continued
Details
       

 08-29-2020
3.50
Continued mid fuselage assembly
Details
       

 08-26-2020
3.00
Continued mid fuselage assembly
Details
       

 08-22-2020
4.50
Prepared parts for the deck of the main seating ar
Details
       

 08-20-2020
4.00
Mid fuselage deck components
Details
       

 08-15-2020
4.50
Forward Mid Fuselage Bulkheads continued
Details
       

 08-09-2020
4.00
Forward Mid Fuselage Bulkheads
Details
       

 08-01-2020
4.50
Started fuselage assembly
Details
       

 07-30-2020
4.00
Prepped bottom skins and moved right wing for stor
Details
     

 07-20-2020
5.00
Finished right wing for now...
Details
       

 07-11-2020
5.50
Added leading edge and fuel tank to right wing
Details
       

 07-07-2020
3.50
Finishing up right wing oatboard leading edge
Details
       

 06-30-2020
7.50
Assembled most of Right Outboard Leading edge
Details
       

 06-21-2020
7.50
Riveted aft right wing skin
Details
       

 06-13-2020
7.00

Details
       

 06-07-2020
6.00
Started aft section of left wing
Details
       

 06-02-2020
6.00
Stopping point for left wing
Details
       

 05-27-2020
3.00
Aileron actuation parts
Details
       

 05-25-2020
3.00
Prepapred aileron actuator rods
Details
       

 05-19-2020
3.00
Installed Left wing gap fairings and started prep
Details
       

 05-17-2020
3.00
Attached left outboard leading edge
Details
       

 05-16-2020
4.00
Added landing light lens and hatch cover
Details
       

 05-11-2020
5.00
Left, outboard leading edge assembly
Details
       

 04-19-2020
5.00
Prepared left wing outboard leading edge parts
Details
       

 04-12-2020
6.00
Riveted top left wing skin
Details
       

 03-27-2020
8.50
Prepared top left wing skins for assembly
Details
       

 03-09-2020
3.50
Finished attaching rear spar to left wing
Details
       

 02-29-2020
7.50
Started on left rear wing spar
Details
       

 02-21-2020
2.50
Assembled aft ribs to left wing spar
Details
       

 02-20-2020
2.00
Assembling brackets and mount foor the left wing
Details
       

 02-15-2020
9.50
Wing rib preparation
Details
       

 02-08-2020
7.50
Leak tested both wing tanks
Details
       

 02-01-2020
5.00
Completed assembly of right wing tank
Details
       

 01-25-2020
6.00
Added tank baffle to right wing tank
Details
       

 01-17-2020
8.50
Continued tank assembly
Details
       

 01-05-2020
8.00
More tank sealing
Details
       

 12-31-2019
7.00
Continued sealing wing tanks
Details
       

 12-15-2019
6.00
Continued to assemble tanks with sealant
Details
       

 12-08-2019
7.50
Started to seal and assemble tanks
Details
       

 12-01-2019
8.50
Continued tank prep.
Details
       

 11-29-2019
5.00
Tank parts prep. continued
Details
       

 11-28-2019
4.00
Continued prep of tank components
Details
       

 11-26-2019
3.00
Prep of tank components
Details
       

 11-25-2019
6.00
Completed right aileron
Details
       

 11-19-2019
2.00
Started assembly of right aileron
Details
       

 11-18-2019
2.00
Completed left aileron assembly
Details
       

 11-17-2019
6.00
Assembling left aileron
Details
       

 11-16-2019
7.00
More aileron work...
Details
       

 11-15-2019
3.00
Aileron parts prep. continued
Details
       

 11-12-2019
3.00
Fitting aileron counterbalances
Details
       

 11-09-2019
5.50
Preparring aileron parts
Details
       

 11-08-2019
5.00
Complete right wing flap
Details
       

 11-03-2019
6.50
Working on right Flap and starting to deburr Ailer
Details
       

 11-01-2019
3.00
Finished assembly of left flap
Details
       

 10-29-2019
2.00
Riveting bottom skin to left flap
Details
       

 10-27-2019
3.00
Started assembly of left flap
Details
       

 10-25-2019
3.00
Prepping left flap parts for assembly
Details
       

 10-22-2019
3.00
Test assembly of the left flap
Details
       

 10-20-2019
5.50
More deburring, priming of flap parts
Details
       

 10-19-2019
7.00
Hours of deburring flap components
Details
       

 10-16-2019
3.50
Added platenuts to wing spars
Details
       

 10-13-2019
5.00
Completed drilling and countersinking left spar
Details

 10-12-2019
6.00
Final drilling and countersinking the right side m
Details
       

 10-11-2019
3.00
Drilling J-channel using main spar as reference
Details
       

 10-09-2019
4.00
Inventoring Wing Components
Details
       

 10-06-2019
0.10
Picking up wing kit tomorrow
Details

 09-13-2019
4.00
Completing fiberglass HS fairings
Details
       

 09-08-2019
4.00
Empannage fairings
Details
       

 09-07-2019
6.00
Fiberglass fairings added to elevators
Details
       

 09-04-2019
2.00
Attached horizontal stabilizer to tailcone
Details
       

 09-03-2019
2.50
Elevator fitting to horizontal stabilizer
Details
       

 09-02-2019
3.00
Rudder fairings
Details
       

 08-30-2019
4.00
Completed tailcone riveting
Details
       

 08-25-2019
8.00
Adding upper side skins to tailcone
Details
       

 08-22-2019
1.00
Riveting rear deck
Details
       

 08-21-2019
1.00
Rear deck plate
Details
     

 08-20-2019
1.50
Routing empennage wiring
Details
       

 08-19-2019
1.50
Added rudder cables and guides, static system
Details
       

 08-18-2019
4.00
Rivetting the rigth side tailcone skin
Details
       

 08-17-2019
4.00
Rivitted left side skin to tailcone
Details
       

 08-15-2019
1.50
Test fitting side skins
Details
       

 08-13-2019
1.50
Contined work on tailcone skins
Details
       

 08-12-2019
1.50
Prep of tailcone side skins
Details
       

 08-11-2019
5.00
Assembling tailcone
Details
       

 08-10-2019
4.00
Started tailcoine assembly
Details
       

 08-09-2019
3.50
Deburring and Priming
Details
       

 08-08-2019
2.00
Deburring tailcone parts
Details
     

 08-06-2019
1.50
Tailcone bulkhead
Details
     

 08-05-2019
2.00
Tailcone parts
Details
       

 08-04-2019
6.00
Tailcone bulkhead assemblies and deburring
Details
       

 08-02-2019
4.00
Elevator and tailcone work
Details
       

 08-01-2019
2.00
Tailcone parts prep and deburring
Details
     

 07-30-2019
2.50
Elevator construction continued
Details
       

 07-28-2019
5.00
Elevator construction
Details
       

 07-27-2019
6.00
Riveting elevator components
Details
       

 07-26-2019
3.00
Riveting Elevator parts
Details
       

 07-25-2019
2.00
Riveting elevator parts
Details
       

 07-24-2019
2.00
Preparation of elevator parts
Details
       

 07-23-2019
2.00
Prepped and primed elevator trim parts
Details
     

 07-22-2019
2.00
Prepped and primed elevator parts
Details
       

 07-21-2019
6.00
Test fitting elevator parts, dimpling skins and pa
Details
       

 07-20-2019
6.00
Elevator parts prep and initial cleco assembly
Details
       

 07-19-2019
3.00
Completed HS riveting
Details
       

 07-16-2019
1.00
Elevator parts deburring and prep.
Details
     

 07-15-2019
1.50
Continued riveting HS, deburring Elevator parts
Details

 07-14-2019
6.00
Riveting horizontal stabilzer
Details
       

 07-13-2019
5.00
Started to assemble the horizontal stabilizer
Details
       

 07-12-2019
3.00
Primed inside HS skins and all other parts
Details
       

 07-11-2019
2.50
Continued to deburr and dimple HS parts
Details
       

 07-10-2019
2.00
Horizontal Stabilizer spar and skin prep
Details
       

 07-09-2019
2.20
Preparing horizontal stabilizer ribs for priming
Details
       

 07-08-2019
1.50
Riveted front spar of horizontal stabilizer
Details
       

 07-07-2019
7.00
Horizontal Stabilizer parts prep.
Details
       

 07-05-2019
7.00
Horizontal Stabilizer work
Details
       

 07-04-2019
7.00
Completed rudder assembly
Details
       

 07-03-2019
3.00
Completed Vertical Satbilizer
Details
       

 07-02-2019
2.00
Riveted vertical stabilizer parts
Details
       

 07-01-2019
1.30
Dimpled Vertical Stabilizer parts
Details

 06-30-2019
7.00
Started vertical stabilize construction
Details
       

 06-29-2019
8.00
Rudder Construction continued
Details
       

 06-22-2019
5.00
Rudder priming and start of assembly
Details
       

 06-21-2019
2.00
More prep and deburring
     

 06-20-2019
2.50
Start of Rudder
Details
     

 06-18-2019
3.50
Unpacking and inventory
Details
       

 06-16-2019
0.00
Empanage kit will arrive tomorrow
Details
     