KitLog pro

Powered By Kitlog Pro v2.0

Edwards Web Site
' style=
Date:  3-17-2023
Number of Hours:  7.00
Manual Reference:  
Brief Description:  Added oil access door to top cowling

Added the oil test access door to the top cowling. Deviated from the plans by fabricating an aluminum backing plate and cutting out the fiberglass mounting flange. I did this to make a much better fit of the door to the cowling surface than could be accomplished if mounted directly to the fibergalss flange per the plans. The door sits flush with the cowling surface.
' style=

Inside view

Inside view

' style=

Top view - open

Top view - open

' style=

Top View - closed

Top View - closed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.