KitLog pro

Powered By Kitlog Pro v2.0

Edwards Web Site
' style=
Date:  3-9-2023
Number of Hours:  9.00
Manual Reference:  
Brief Description:  Continued cowling work

Added the air inlet ramps to the top cowling. Smoothed the transition with micro-balloon epoxy mixture. Added epoxy coating to seal sanded surfaces.
' style=

Inside view after installing

Inside view after installing

' style=

Close up

Close up

' style=

Inside view after epoxy coating

Inside view after epoxy coating

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.