Powered By Kitlog Pro v2.0
TODD'S WEB SITE
RV-10
Vertical Stab
10-18-2006
< Previous Log Entry
Next Log Entry >
Date:
10-18-2006
Number of Hours:
0.70
Manual Reference:
Sec 6 - VS
Brief Description:
VS ready for priming
Short session this time. Dimpled the front spar and CSK'd the corresponding holes on the doubler. Match drilled the top lower hinge bracket and rudder stops. The VS is now ready for priming.
Front spar dimples
Doubler CSKs
Rudder stops clecoed to the hinge bracket
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
481
732
Avionics
9
9
Cowling
16
16
Electrical
1
1
Elevators
46
83
Empennage
4
5
Empennage Attach
13
24
Engine
19
19
Fuselage
131
131
Horiztontal Stab
38
82
Inventory
2
4
Miscellaneous
2
2
Prop
5
5
Rudder
14
24
Tailcone
63
140
Vertical Stab
14
35
Wings
104
152
Copyright © 2001-2024 Matronics. All Rights Reserved.