KitLog pro

Powered By Kitlog Pro v2.0

TODD'S WEB SITE
' style=
Date:  10-15-2006
Number of Hours:  6.10
Manual Reference:  Sec 6 - VS
Brief Description:  Assembled frame, attached and drilled skin

Assembled the frame and final drilled the ribs to the froant and rear spars. Then attached the skin--that was real fun. I tried every which way but finally got it on after much consternation. Had one small dent from the middle nose rib. After I final drilling the skin, I trimmed that rib a little more so it should not be am issue when I go to rivet. I think the way to go for assembly next time is to leave the nose ribs off the front spar, cleco the skin on and then put the ribs in. We shall see if that works or not.
' style=

Match drilling the spar components

Match drilling the spar components

' style=

Assembled VS frame

Assembled VS frame

' style=

VS skin ready for drilling

VS skin ready for drilling

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.