KitLog pro

Powered By Kitlog Pro v2.0

Bruces S-19 Build Log
< Previous Log Entry          Next Log Entry >
' style=
Date:  7-22-2019
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Started moving oil cooler

Decided to hang the oil cooler under the gearbox and worked up require brackets.
The cooler is supported in the orriginal kit rubber cushoned frame. its supported on the top with angle brackets connected to the engine (unused) forward crankcase mount bolt holes. and prevented from rotation by struts connected to the gearbox.
Cut a hole in the cowl for the new air inlet.
' style=





' style=




' style=




' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.