Powered By Kitlog Pro v2.0
Bruces S-19 Build Log
S-19 Venterra
Vertical Stablizer
13 Logs Found
Date
Hours
Work Log Summary
Details
06-21-2009
6.0
Finished Vertical Stabiliser
Details
06-17-2009
4.0
6/17 - 6/19 Deburing skins
Details
05-31-2009
6.0
Finished drilling the leading edge
Details
05-30-2009
8.0
Started fiting VS Leading Edge skins
Details
05-29-2009
3.0
Drilling VS side skins
Details
05-25-2009
6.0
Finished VS frame
Details
05-24-2009
8.0
Drilled Vertical Stablizer rear spar
Details
05-23-2009
12.0
Fixed the elongated holes in the front spar
Details
05-22-2009
2.0
Repaired the elongated holes in the Front spar
Details
05-10-2009
8.0
Primed the vertical stab frame details
Details
05-08-2009
6.0
Continue on with vert stab
Details
05-05-2009
2.0
First attempt to fix the root plate holes
Details
05-03-2009
4.0
Started Vertical Stablizer
Details
SITE NAVIGATION
Contact Builder
S-19 Venterra Home
All
Aft Fuselage
Aileron
Builder
Center Fuselage
Controls
Demo Flight
Distractions
Electrical
Empennage
Flaps
Forward Fuselage
Fuselage
Horiz Stabilator
Instruments
Landing Gear
Project
Rudder
Seats
Shop
Tips
Tools
Trim Tab
Vertical Stablizer
Wings
Copyright © 2001-2013 Matronics. All Rights Reserved.