Powered By Kitlog Pro v2.0
Bruces S-19 Build Log
S-19 Venterra
Horiz Stabilator
28 Logs Found
Date
Hours
Work Log Summary
Details
08-24-2009
2.0
Finished Horizontal Stabilator and Empennage
Details
08-23-2009
8.0
Riveted trim Tab and trimed Stabilator tips
Details
08-21-2009
3.0
Primed Trim Tab parts
Details
08-20-2009
2.0
Debured and preped Trim Tab for paint
Details
08-18-2009
3.0
Finished riveting Stab skins
Details
08-17-2009
3.0
Continue Riveting skins
Details
08-15-2009
8.0
Riveted Stab upper skin
Details
08-12-2009
3.0
Riveted frame, started skining
Details
08-11-2009
3.0
Riveting Horizontal Stab Frame
Details
08-10-2009
3.0
Riveted Stab frame front spar
Details
08-09-2009
2.0
Started final assembly
Details
08-08-2009
12.0
Primered the Stab
Details
08-06-2009
3.0
Deburing
Details
08-05-2009
3.0
deburing
Details
08-04-2009
3.0
Deburing
Details
08-02-2009
5.0
Debur and edge polish H.S.
Details
08-01-2009
4.0
Hinge pin fab and deburing
Details
07-27-2009
2.0
Deburing begins
Details
07-25-2009
9.0
Drilled out skins to full size
Details
07-20-2009
3.0
Trial fit of trim tab
Details
07-18-2009
8.0
Installing forward skins
Details
07-16-2009
4.0
Continued drilling stabilator skins
Details
07-11-2009
8.0
Fixing a new mistake
Details
07-04-2009
6.0
Started skining stabilator
Details
07-02-2009
6.0
Loaded frame in jig
Details
06-28-2009
4.0
Drilled out the frame to full size.
Details
06-27-2009
6.0
Clecoed Stabilator frame
Details
06-26-2009
4.0
Started Horizontal Stabilator
Details
SITE NAVIGATION
Contact Builder
S-19 Venterra Home
All
Aft Fuselage
Aileron
Builder
Center Fuselage
Controls
Demo Flight
Distractions
Electrical
Empennage
Flaps
Forward Fuselage
Fuselage
Horiz Stabilator
Instruments
Landing Gear
Project
Rudder
Seats
Shop
Tips
Tools
Trim Tab
Vertical Stablizer
Wings
Copyright © 2001-2013 Matronics. All Rights Reserved.