Bruces S-19 Build Log
Work Logs Found: 452
Category Work Time: 1976 Hours
 Date
Hours
Work Log Summary

Details

 11-06-2018
1.00
Installed External Power Plug door
Details
       

 10-09-2018
1.00
Installed elevator bungie
Details
     

 10-04-2018
1.00
Static leak check
Details
       

 09-24-2018
1.00
First Taxi
Details
       

 09-21-2018
1.00
Weighed Aircraft
Details
       

 09-13-2018
1.00
Oil door
Details
       

 09-03-2018
1.00
Built a aircraft jack
Details
       

 08-23-2018
1.00
Control Surface Assy
Details
       

 08-20-2018
1.00
Installed Wings
Details
       

 08-14-2018
1.00
Moved Airplane to hanger
Details