KitLog pro

Powered By Kitlog Pro v2.0

Norris's RV Construction
' style=
Date:  8-25-2021
Number of Hours:  3.50
Manual Reference:  
Brief Description:  

Tested #2 Alternator wireing.
Made and installed a starter scable from the starter solenoid to the starter.
Installed the starter solenoid.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.