KitLog pro

Powered By Kitlog Pro v2.0

Norris's RV Construction
Work Logs Found: 29
Category Work Time: 175 Hours
 Date
Hours
Work Log Summary

Details

 12-30-2020
4.00
Made a new magnetometer base and installed

 12-22-2020
6.00
Installed the wireing for the OATs and Magnetomete
     

 12-21-2020
1.50
Wiring up the two Magnetometers
     

 12-15-2020
1.50
Figuring out mounting for the two Magnetometers

 12-03-2020
7.00
Backup power
Details

 06-16-2020
6.00
Finished all connections to transponder except ant

 06-15-2020
5.00
See Detailed
Details

 06-09-2020
5.00
Finished wiring all that I could and started on pa
       

 06-08-2020
6.00
Ordering parts and continuing wireing

 06-05-2020
6.00
Wireing RS232 connections

 06-04-2020
6.00
Continue wiring CAN buss

 06-02-2020
3.00
Finish installing the wiring from the sticks

 06-01-2020
5.00
Made a wire loom for Pilot and Co Pilot sticks
     

 05-26-2020
8.00
FWF wires
Details

 05-22-2020
5.00
Continue wiring up switches

 05-21-2020
8.00

Details

 05-20-2020
9.00
See full description
Details

 05-18-2020
9.00
See detailed description
Details
       

 05-15-2020
9.00
continued avionics wiring

 05-13-2020
9.00
Wireing Alternator and Bus manager

 05-12-2020
5.00
Installed a firewall pass thru plus
Details

 05-11-2020
7.00
Finished fuel pump wireing

 05-08-2020
6.00
Started working on fuel pump wireing

 05-05-2020
3.00
Connect flaps power and position sensor

 05-01-2020
8.00
Installed Rudder tPanel uprim actuator wiring.
       

 04-30-2020
8.00
Continue wiring panel

 04-29-2020
7.00
Wired up contactors. Installed master and Bat sel

 04-28-2020
4.00
installed VPX. Installed panel.

 04-27-2020
8.00
panel work
Details










Copyright © 2001-2021 Matronics. All Rights Reserved.