Andair Fuel Valve work. Assembled ports in correct orientation for RV-7. Staked screws on L and R ports. Drilled mounting holes. For center flap block, found a crack in the rib where the hole was drilled (tore it a bit pushing through. Fabricated and installed doubler on rib/flange to reinforce the area.