Brief Description: Match drilled all holes aft of and including F-704
Match drilled all holes aft of and including F-704. Drilled F770 to tailcone, drilled F706 interface. Drilled baggage structures. Fluted, installed and drilled arm rests. Drilled F623/F770/F724 (baggage bulkhead). Ready for longeron drilling after I get back from vacation. Excellent stoppint point for now.