KitLog pro

Powered By Kitlog Pro v2.0

Pete's Bearhawk Web Site
Work Logs Found: 85
Category Work Time: 111 Hours
 Date
Hours
Work Log Summary

Details

 12-24-2008
1.50
Finished riveting the right aileron
Details

 12-10-2008
1.00
assembled and blind riveted the left aileron.
Details

 12-09-2008
1.00
Finished riveting the right aileron.
Details

 12-07-2008
1.00
Flush riveted aileron nose skin.
Details

 12-02-2008
1.00
Assembled the right aileron.
Details

 11-28-2008
2.00
filled aileron counter balance tubes.
Details

 11-14-2008
0.50
Finshed riveting the ribs to the righ aileron spar
Details

 11-12-2008
1.00
Began assembling the right aileron.
Details

 11-08-2008
2.50
began assembling the left aileron.
Details

 11-05-2008
1.00
Finished riveting the right flap.
Details

 11-03-2008
1.00
Riveted the bottom of the right flap.
Details

 11-02-2008
0.50
blind riveted the nose ribs to the skin.
Details

 10-29-2008
0.50
finished assembling the right flap.
Details

 10-27-2008
1.00
riveted ribs onto right flap.
Details

 10-21-2008
1.50
Finished riveting the left flap.
Details
       

 10-20-2008
1.00
More riveting on the left flap
Details

 10-13-2008
1.00
More riveting of the left flap.
Details

 10-12-2008
0.50
Riveting left flap
Details

 10-10-2008
1.00
Riveting nose skin.
Details

 10-09-2008
1.50
reassembled the left flap
Details

 09-29-2008
1.00
Drilled more holes in the left flap.
Details

 09-03-2008
1.00
More riveting of the rear flap ribs.
Details

 09-02-2008
1.50
Riveted the remainder of the flap attach angles
Details

 08-27-2008
2.00
Riveting flap rib attach angles
Details
       

 08-22-2008
1.50
Riveted attach angles...
Details

 08-21-2008
0.50
Filed the flap hinge holes.
Details

 08-18-2008
1.00
Cut out hinge holes on flap nose skin.
Details

 08-14-2008
1.50
Finished redrilling the left flap nose skin.
Details
     

 08-13-2008
1.00
Fit and drilled the new doubler plates.
Details

 08-12-2008
0.50
Redrilled the left flap attach angles
Details
     

 08-11-2008
1.00
(re)formed the flap hinge doublers.
Details

 08-09-2008
2.50
Prepped and primed the control surfaces
Details

 08-08-2008
1.00
prepped ailerons for priming
Details

 08-07-2008
1.00
Finished dimpling aileron skins and spars
Details

 08-06-2008
1.00
Began dimpling the ailerons.
Details

 08-05-2008
1.00
finished deburring the right aileron
Details

 07-21-2008
0.50
More Deburring/Disassembly or right aileron
Details

 07-18-2008
1.00
More deburring the ailerons.
Details

 07-16-2008
1.00
More deburring of the left aileron
Details

 07-15-2008
1.00
began deburring the ailerons
Details

 07-14-2008
1.00
Back on it! cut out aileron hinge holes in nose s
Details
       

 04-30-2008
1.00
Finished drilling the aileron skins.
Details

 04-22-2008
1.00
worked on the left aileron.
Details

 04-21-2008
2.00
Work on the aileron gussetts was performed.
Details
     

 04-14-2008
1.00
Cut out aileron gussetts.
Details

 04-09-2008
1.50
Worked on aileron nose skins
Details

 04-07-2008
1.00
Finished drilling the aileron nose skin(s)
Details
     

 03-31-2008
1.00
resumed work on the ailerons
Details

 03-15-2008
2.50
Worked on the aileron nose skins.
Details
       

 03-09-2008
1.50
Finished bending skins and marked for first holes.
Details

 02-27-2008
1.00
Worked on Brake
Details

 02-26-2008
1.50
Finished drilling rear aileron ribs.
Details
       

 02-25-2008
1.00
drilled left aileron rear ribs.
Details

 02-17-2008
1.00
prepped ribs for mounting.
Details

 02-10-2008
2.00
Drilled the hinge doubler plates and rear attach a
Details

 02-02-2008
2.00
Drilled all the nose ribs to the aileron spars.
Details
       

 01-23-2008
1.50
Began drilling nose rib attach angles to spar.
Details

 01-22-2008
1.00
Started marking hinge locations.
Details

 01-19-2008
1.50
Finished dimpling the flap skins/spars.
Details

 01-15-2008
1.50
Deburring and Dimpling.
Details
     

 01-14-2008
1.50
Deburred almost all holes in the right flap.
Details

 01-08-2008
1.50
Disassembled and cut holes for flap hinges.
Details

 01-07-2008
2.00
Finished drilling the right flap.
Details
       

 01-05-2008
2.00
Finished drilling the #40 holes in the top of the
Details
     

 01-02-2008
1.00
Drilled more holes in the right flap nose skin.
Details
     

 01-01-2008
2.00
Drilled Right flap nose skin
Details
       

 12-29-2007
1.50
assembled the right flap skeleton and drilled 1st
Details

 10-02-2007
1.00
Finished deburring the left flap.
Details
     

 10-01-2007
1.00
Began deburring the left flap parts.
Details

 09-25-2007
1.00
Cut out hinge area and disassembled "right" flap.
Details
     

 09-24-2007
1.00
Finished drilling the right flap.
Details

 09-20-2007
0.50
Began drilling the underside of the right flap.
Details

 09-19-2007
1.50
Fit and drilled gussetts to top of right flap.
Details
     

 09-18-2007
1.50
Recut Gussets...... :-(
Details
     

 09-17-2007
0.50
Cut out flap gussetts.
Details

 09-12-2007
2.00
Drilled more on the righ flap nose skin
Details
       

 09-11-2007
1.50
Began drilling the right flap nose skin.
Details
       

 09-10-2007
1.00
Bent flap nose skin, aileron spar and training edg
Details
     

 09-06-2007
1.50
Deburred and reassembled the flap skeleton.
Details
       

 09-05-2007
1.00
Finished drilling the flap ribs to the spar.
Details

 09-04-2007
1.50
Drilled and fitted the left flap ribs.
Details
     

 08-30-2007
4.00
Finished drilling nose ribs and hinge doublers.
Details
       

 08-29-2007
4.00
Began fitting nose ribs to the flap spars.
Details
       

 08-21-2007
1.50
Cut aileron and flap nose skins.
Details
       

 08-14-2007
1.50
Began prepping for the flap assembly.
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.