Date
|
Hours
|
Work Log Summary

|
Details

|
04-25-2014
|
1.00
|
Nose wheel spat
|
Details
|
  |
|
04-25-2014
|
2.00
|
Fuel tank
|
Details
|
  |
|
04-24-2014
|
2.00
|
Main wheel spat
|
Details
|
  |
|
04-23-2014
|
6.00
|
Canopy
|
Details
|
  |
|
04-22-2014
|
10.00
|
Fuel system
|
Details
|
  |
|
01-13-2014
|
10.00
|
Fuel system and tank.
|
Details
|
  |
|
01-12-2014
|
10.00
|
Canopy
|
Details
|
  |
|
05-05-2013
|
5.00
|
Cowl .
|
Details
|
  |
|
05-04-2013
|
6.00
|
Cowl
|
Details
|
  |
|
04-14-2013
|
10.00
|
Cowl
|
Details
|
  |
|
04-13-2013
|
5.00
|
Cowl
|
Details
|
  |
|
02-23-2013
|
5.00
|
Fuselage side Stiffner SB
|
Details
|
  |
|
02-22-2013
|
3.00
|
Jack and prepare for Side skin stiffner.
|
Details
|
  |
|
10-14-2012
|
5.00
|
Undercarriage and engine fitting.
|
Details
|
  |
|
08-26-2012
|
7.00
|
Main wheel spats
|
Details
|
|
|
08-23-2012
|
1.00
|
Main wheel fairing assembly fitting. X 1
|
Details
|
  |
|
08-20-2012
|
1.00
|
Main wheel fairing assembly fitting.
|
|
 |
|
08-17-2012
|
1.00
|
Continue Nose wheel fairing assembly fitting. Stil
|
|
  |
|
08-16-2012
|
1.00
|
Continue Nose wheel fairing assembly fitting.
|
|
  |
|
08-15-2012
|
1.00
|
Continue Nose wheel fairing assembly fitting.
|
|
  |
|
08-13-2012
|
1.00
|
Continue Nose wheel fairing assembly fitting.
|
|
  |
|
08-12-2012
|
1.00
|
Continue Nose wheel fairing assembly fitting.
|
|
  |
|
08-11-2012
|
2.50
|
Cut nose leg fairing retainer hinge to length.
|
Details
|
  |
|
08-06-2012
|
1.50
|
Continue trim & drill off of nosewheel spat.
|
|
|
|
08-05-2012
|
4.00
|
Start nose wheel spat assembly.
|
Details
|
|
|
08-04-2012
|
7.00
|
Fuel tank assembly. Gorilla snot!
|
Details
|
|
|
08-03-2012
|
3.50
|
Fuel tank preparation for assembly.
|
Details
|
|
|
08-02-2012
|
1.50
|
Cut out and finish Return fitting bracket.
|
Details
|
|
|
08-01-2012
|
2.50
|
Fit doubler ring to front wall of fuel tank.
|
Details
|
 |
|
07-31-2012
|
3.00
|
Dimple missed upper side skin to dash panel attach
|
Details
|
  |
|
07-30-2012
|
1.50
|
Manufacture canopy strut attachment point doubler
|
Details
|
 |
|
07-29-2012
|
4.00
|
Fit firewall shelf and upper fire wall
|
Details
|
 |
|
07-28-2012
|
2.00
|
Prime Cockpit side of side skins.
|
Details
|
 |
|
07-27-2012
|
2.00
|
Remove Stb skin for tidy up & refitting.
|
Details
|
  |
|
07-26-2012
|
3.00
|
Refit Port side skin.
|
Details
|
|
|
07-25-2012
|
2.00
|
Remove port skin and finish off spar cut out.
|
Details
|
|
|
07-24-2012
|
3.00
|
Side skin spar cutouts.
|
Details
|
  |
|
07-23-2012
|
2.00
|
Prepare and trial fit axle stubs & Brakes.
|
Details
|
  |
|
07-21-2012
|
2.00
|
Cowl attachment hinge strips
|
Details
|
  |
|
07-20-2012
|
1.50
|
Fit brake Hydraulic fittings to undercarriage
|
Details
|
 |
|
06-15-2012
|
2.50
|
Prepare mapbox in lower panel
|
Details
|
 |
|
06-14-2012
|
1.00
|
Fit stiffner to left instrument panel
|
|
  |
|
06-13-2012
|
3.00
|
Prepare dash panels
|
Details
|
 |
|
06-12-2012
|
3.00
|
Assemble nose wheel fork
|
|
|
|
06-11-2012
|
5.00
|
Assemble main wheels
|
|
  |
|
06-10-2012
|
5.00
|
Dimple & fit nut plates to instrument panel tray
|
|
 |
|
06-09-2012
|
3.00
|
Fit Anchor nuts to main gear spat brackets
|
|
 |
|
06-08-2012
|
5.00
|
Fuselage longerons and side skins
|
Details
|
  |
|
06-08-2012
|
2.00
|
Fit nut plates to instrument panel supports
|
|
  |
|
06-07-2012
|
3.50
|
Fuselage longerons
|
Details
|
|
|
06-05-2012
|
3.00
|
Roll Autopilot servo
|
Details
|
 |
|
06-04-2012
|
2.00
|
Pitch Autopilot servo
|
Details
|
 |
|
06-03-2012
|
1.50
|
Control system
|
Details
|
 |
|
06-02-2012
|
4.00
|
Control push rods
|
Details
|
  |
|
05-31-2012
|
2.00
|
Wing pins
|
Details
|
  |
|
05-30-2012
|
1.50
|
Floor panels continue
|
Details
|
  |
|
05-29-2012
|
3.00
|
Flaperon Belcrank and Floor panels
|
Details
|
 |
|
05-28-2012
|
25.50
|
Vent Doors
|
Details
|
  |
|
05-09-2012
|
1.00
|
Prep & Prime step brackets.
|
|
  |
|
05-08-2012
|
1.00
|
Step support bracket remake
|
Details
|
  |
|
05-07-2012
|
1.00
|
Fuselage parts assemble
|
Details
|
  |
|
05-06-2012
|
10.00
|
Roll bar assemble
|
Details
|
 |
|
05-05-2012
|
8.00
|
Prep & Prime
|
Details
|
  |
|
04-25-2012
|
3.00
|
Fuel system
|
Details
|
|
|
04-22-2012
|
10.00
|
Lower firewall fuse assembly
|
Details
|
|
|
04-20-2012
|
10.00
|
floor area and lower skin
|
Details
|
|
|
04-19-2012
|
3.00
|
Floor frames
|
Details
|
|
|
04-18-2012
|
2.00
|
Floor & Seat
|
Details
|
|
|
04-17-2012
|
2.00
|
Floor ribs
|
Details
|
|
|
04-16-2012
|
2.00
|
Control column brackets
|
Details
|
|
|
04-15-2012
|
6.00
|
Front of seat bylkhead
|
Details
|
|
|
04-14-2012
|
5.00
|
Continue seat base assemble
|
|
 |
|
04-13-2012
|
2.00
|
Seat base
|
Details
|
|
|
04-11-2012
|
3.00
|
Seat base parts
|
Details
|
|
|
04-10-2012
|
7.00
|
Flaperon actuator brackets
|
Details
|
 |
|
04-09-2012
|
12.00
|
Fuselage Baggage area floor and ribs
|
Details
|
|
|
04-08-2012
|
10.00
|
Fuselage unpack and sort parts
|
Details
|
  |