Date
|
Hours
|
Work Log Summary

|
Details

|
03-13-2019
|
1.00
|
Designed and Installed Aft Cowl Support
|
Details
|
|
|
11-06-2018
|
1.00
|
Installed External Power Plug door
|
Details
|
|
|
09-13-2018
|
1.00
|
Oil door
|
Details
|
|
|
08-07-2018
|
1.00
|
Glassed over old scoop location
|
Details
|
|
|
08-07-2018
|
1.00
|
continued fiberglassing cowl
|
Details
|
|
|
08-04-2018
|
1.00
|
Final Cowl Trim
|
Details
|
|
|
07-30-2018
|
1.00
|
Designed, fabricated and installed the landing lig
|
Details
|
|
|
07-28-2018
|
1.00
|
Installed the heater air inlet scoop
|
Details
|
|
|
07-12-2018
|
1.00
|
Built heater air inlet
|
Details
|
|
|
07-08-2018
|
1.00
|
glassed in a lower ramp segment of the duct
|
Details
|
|
|
06-17-2018
|
1.00
|
Glassed in the air scoop into its new location
|
Details
|
|
|
06-08-2018
|
1.00
|
Rebuilt scoop in new location
|
Details
|
|
|
05-31-2018
|
1.00
|
Cut out the old air scoop location
|
Details
|
|
|
05-30-2018
|
1.00
|
Started modifying cowing radiator scoop
|
Details
|
|
|
01-07-2016
|
1.00
|
Cowling trim
|
Details
|
|
|
01-02-2016
|
1.00
|
Started on Cowling
|
Details
|
|