Date
|
Hours
|
Work Log Summary

|
Details

|
09-19-2014
|
4.00
|
propeller/spinner gap plates rivited on, misc
|
Details
|
|
|
09-09-2014
|
3.00
|
Spinner gap plate letft side fabricated and misc
|
Details
|
|
|
09-08-2014
|
2.50
|
Spinner/prop gap filler plate
|
Details
|
|
|
09-06-2014
|
1.50
|
Spinner build up inside and alignment check. Prop
|
Details
|
|
|
09-05-2014
|
2.00
|
Spinner work and prop bolt safety wire
|
Details
|
|
|
09-04-2014
|
5.50
|
Spinner installation-the plate nuts
|
Details
|
|
|
09-03-2014
|
5.00
|
Propeller blade cut outs in spinner and misc
|
Details
|
|
|
08-25-2014
|
0.50
|
Propeller install check
|
Details
|
  |
|
08-24-2014
|
2.00
|
propeller bolt washer modification to fit
|
Details
|
|
|
08-24-2014
|
0.25
|
Prop track preliminary check
|
Details
|
 |
|
08-23-2014
|
2.50
|
temp install of propeller.
|
Details
|
|
|
09-26-2013
|
0.50
|
propellar and spacer kit arrived today
|
Details
|
|