Date
|
Hours
|
Work Log Summary

|
Details

|
11-10-2007
|
3.00
|
Glued Leading Edge of Canard Into Jig
|
|
  |
|
11-09-2007
|
3.00
|
Set Up Jig and Fit Canard in Place
|
|
  |
|
11-05-2007
|
2.00
|
Drilled Holes for Lift Tabs
|
|
  |
|
11-04-2007
|
6.00
|
Layed Up "U" section of canard
|
|
  |
|
11-03-2007
|
6.00
|
Alagined and Jigged Canard Foam
|
|
  |
|
10-16-2007
|
4.00
|
Working On Lift Tab Installation and Foam Jig
|
|
  |
|
10-11-2007
|
8.00
|
Install Antennae in Winglets
|
|
  |
|
09-23-2007
|
8.00
|
Rudder Layup
|
|
  |
|
09-20-2007
|
1.00
|
Sand Bottom Spar Cap
|
|
  |
|
09-18-2007
|
1.00
|
Sand Bottom Wing Spar
|
|
  |
|
09-17-2007
|
1.00
|
Bottom Wing Spar Cap Sanding
|
|
  |
|
09-14-2007
|
4.00
|
Prepping Wing For Bottom Layup
|
Details
|
  |
|
09-13-2007
|
4.00
|
Installed COM In Wing
|
Details
|
  |
|
09-08-2007
|
10.00
|
Left Wing Bottom Spar Cap Layup
|
Details
|
  |
|
03-10-2007
|
10.00
|
Installed Top Wing Layup
|
Details
|
  |
|
03-03-2007
|
8.00
|
Installed Top Spar Cap
|
Details
|
  |
|
02-24-2007
|
8.00
|
Glassed Bottom of the wing
|
|
  |
|
02-16-2007
|
2.50
|
Bottom of Wing Prep for Glassing
|
Details
|
  |
|
12-30-2006
|
8.00
|
Installed Antenna inside foam
|
|
|
|
12-23-2006
|
8.00
|
Installed Bottom Spar Cap
|
|
 |
|
12-04-2006
|
2.00
|
Bond leading edge of wing to shear web
|
Details
|
|
|
12-03-2006
|
8.00
|
Wing Cap
|
Details
|
 |
|
12-02-2006
|
5.00
|
Wing Attach Points
|
Details
|
|
|
11-11-2006
|
8.00
|
Started Jigging and Glueing Wing Cores
|
Details
|
|
|
11-05-2006
|
4.00
|
Wing Jigs Laid out Wings
|
Details
|
|
|
10-16-2006
|
8.00
|
Main Wing Jigs
|
Details
|
|
|
10-08-2006
|
3.00
|
Cut Out Temp. Firewall
|
Details
|
 |
|
10-03-2006
|
3.00
|
Fire Wall Cutout
|
Details
|
  |
|
09-17-2006
|
10.00
|
Installed Top of Spar Box
|
Details
|
 |
|
09-16-2006
|
12.00
|
Worked on Wing Spar, Completed First Layup
|
Details
|
|
|
09-01-2006
|
6.00
|
Spar
|
Details
|
  |
|
08-26-2006
|
5.00
|
Building Jig for Spar
|
Details
|
 |
|
07-30-2006
|
10.00
|
Hot Wired Canard
|
Details
|
  |
|
04-16-2006
|
4.00
|
Prepare Foam For Layup
|
Details
|
 |
|
04-15-2006
|
4.00
|
Dished Out Control Stick and Fuel Sight Areas
|
Details
|
|
|
04-06-2006
|
2.00
|
Cut Pieces for Inside Shaping of Fuselage
|
Details
|
  |
|
04-03-2006
|
3.00
|
Scrapped Bad Longeriron Parts, Cleaned Epoxy Pump
|
Details
|
  |
|
04-02-2006
|
12.00
|
Set Up Longerirons
|
Details
|
  |
|
04-01-2006
|
6.00
|
Fuselage Sides, Build Frames and Extended Table
|
Details
|
  |
|
03-26-2006
|
8.00
|
Trimmed Instrument Panel and Started on Forms for
|
Details
|
  |
|
03-19-2006
|
4.00
|
Continued Work on Instrument Panel and Aft Landing
|
Details
|
  |
|
02-28-2006
|
3.00
|
Instrument pnl front and remaining hard points
|
Details
|
  |
|
02-26-2006
|
6.00
|
Front Side of Instrument PNL, and Landing Gear Bul
|
Details
|
|
|
02-23-2006
|
3.00
|
Traced Then Layed Out Rear Landing Gear Bulkhead
|
Details
|
 |
|
02-21-2006
|
2.00
|
Same as 2/20/06 mirror image layup
|
Details
|
  |
|
02-20-2006
|
2.00
|
layed up 22 BID for "hard point" on Landing Gear B
|
Details
|
  |
|
02-18-2006
|
5.00
|
Cut Out Instrument Panel and 1st Layup
|
Details
|
 |
|
02-16-2006
|
3.00
|
Bulkhead F22 and F28 Trimmed Glass
|
Details
|
|
|
02-13-2006
|
5.50
|
Bulkheads F22 and F28 Last Layup
|
Details
|
  |
|
02-12-2006
|
5.00
|
Bulkhead F22 and F28
|
Details
|
  |
|
02-10-2006
|
4.00
|
Front Seat Last Layup
|
Details
|
|
|
02-09-2006
|
8.00
|
Front Seat repair
|
Details
|
|
|
02-08-2006
|
4.00
|
Front Seat first layup
|
Details
|
  |