KitLog pro

Powered By Kitlog Pro v2.0

My RV-8 Build Log

Builder:
Chris Cook
Location:
Columbus, GA - USA
Aircraft:
Van's Aircraft - RV-8
Manufacturer:   
http://www.vansaircraft.com/
Engine:
Lycoming - IO360-A1A
Prop:
Hartzell - C2YR-1BFP/F74972 72" - Constant Pitch
Total Build Time:
2540 Hours

Welcome to my Experimental Aircraft Web Site.

Recent Activity
 Date Hours Work Log Summary Details
 03-09-2019
6.0
Elevator And Trim Tab Re-Installation
Details
       

 03-03-2019
4.0
Rudder And Rudder Light Re-Installation
Details
       

 02-28-2019
2.0
Rudder Top Fairing
Details
       

 02-26-2019
2.0
Empennage Re-Installation And Rudder Top Fairing
Details
       

 02-17-2019
4.0
Empennage Fairings
Details
       

 01-26-2019
5.0
Flap Hinge And Aileron Stop Work
Details
       

 01-19-2019
4.0
HS And VS Fairing End Caps
Details
       

 01-06-2019
5.0
Control Surfaces Re-Install
Details
       

 01-05-2019
4.0
GMU 22 Re-Install
Details
       

 01-01-2019
5.0
Fuel Line Connections, Fuel Valve Re-Install
Details
       










Copyright © 2001-2019 Matronics. All Rights Reserved.