KitLog pro

Powered By Kitlog Pro v2.0

My RV-8 Build Log

Builder:
Chris Cook
Location:
Columbus, GA - USA
Aircraft:
Van's Aircraft - RV-8
Manufacturer:   
http://www.vansaircraft.com/
Engine:
Lycoming - IO360-A1A
Prop:
Hartzell - C2YR-1BFP/F74972 72" - Constant Pitch
Total Build Time:
2516 Hours

Welcome to my Experimental Aircraft Web Site.

Recent Activity
 Date Hours Work Log Summary Details
 01-19-2019
4.0
HS And VS Fairing End Caps
Details
       

 01-06-2019
5.0
Control Surfaces Re-Install
Details
       

 01-05-2019
4.0
GMU 22 Re-Install
Details
       

 01-01-2019
5.0
Fuel Line Connections, Fuel Valve Re-Install
Details
       

 12-30-2018
4.0
Install Placards
Details
       

 12-26-2018
4.0
Install Wings And NAS Close Tolerance Bolts
Details
       

 12-03-2018
2.0
More HS And VS Fairing Work
Details
       

 12-01-2018
4.0
HS And VS Fairings
Details
       

 11-18-2018
4.0
Rudder Installation And Fairing Check
Details
       

 11-11-2018
4.0
New VS Rear Spar Attach
Details
       










Copyright © 2001-2019 Matronics. All Rights Reserved.