KitLog pro

Powered By Kitlog Pro v2.0

Woody's Web site
' style=
Date:  9-14-2002
Number of Hours:  1.50
Manual Reference:  5.4 5.5
Brief Description:  Lower Longeron Doublers/Elec Channel.

Installed the two 20" triangular doublers to the aft end of the lower longerons. This will make the ends square. Trimmed the cutout for the electrical channels and applied 1 ply BID in the channel I did not charge time to this for the day but started building the epoxy heating box. Already need this for large layups
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.