Powered By Kitlog Pro v2.0
Woody's Web site
Cozy MK IV
Fuselage Sides
9-15-2002
< Previous Log Entry
Next Log Entry >
Date:
9-15-2002
Number of Hours:
3.00
Manual Reference:
5.6
Brief Description:
LWX and LWY and Elec Channel
Installed LWX and LWY to both sides. Formed foam for the electrical channel covers. Tried to put tape on the covers. This was totally futile so I will just do the layup of 1 ply BID to the foam without micro and carve the foam out later.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Pitts Model 12 Home
Cozy MK IV Home
Category
# Logs
# Hours
All
413
977
Bulkheads
49
103
Canard
36
122
Canard Install
14
19
Center Section Spar
34
136
Controls
4
2
Courtney
1
0
Elevators
27
38
Fuselage Assembly
46
99
Fuselage Exterior
35
105
Fuselage Sides
30
70
Headrests, Heat Duct
22
39
Main Landing Gear an
46
100
Miscellaneous
4
9
Nose and Nose Gear
57
105
Wings
8
30
Copyright © 2001-2024 Matronics. All Rights Reserved.