KitLog pro

Powered By Kitlog Pro v2.0

Woody's Web site
' style=
Date:  9-13-2002
Number of Hours:  4.00
Manual Reference:  5.4
Brief Description:  Upper Longeron Layup

Applied the 4 plys of UND along the length of the sides. This took a long time because the temperature dropped while I was doing it so the epoxy became difficult to work
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.