KitLog pro

Powered By Kitlog Pro v2.0

Wendells RV-6A
' style=
Date:  8-27-2020
Number of Hours:  6.00
Manual Reference:  Vertical Stab
Brief Description:  Final Drill Vertical Stab attach holes.

I drilled enough #30 holes in the forward spars to allow me to remove the work and finish drilling the remaining F681 holes with better access. I will rivet and bolt the spar, spacer, F681 and steel reinforcement onto the vertical stabilizer. Re-installing it, I can final drill the 4 holes in the horizontal stabilizer spar so it can also be bolted up. I also have some finish drilling on the rear spar and fuselage attach points to be 100% complete, including the rear steel tie down plate.. I can invision the end, and it makes me smile.
' style=

Top 2 will be #12 drilled for AN3. Bottom 2 will be AN4 plus one more.

Top 2 will be #12 drilled for AN3. Bottom 2 will be AN4 plus one more.

' style=

Drilled enough #30 to ensure solid placement.

Drilled enough #30 to ensure solid placement.

' style=

Ready to come off for finishing.

Ready to come off for finishing.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.