KitLog pro

Powered By Kitlog Pro v2.0

Wendells RV-6A
< Previous Log Entry          Next Log Entry >
' style=
Date:  8-22-2023
Number of Hours:  3.00
Manual Reference:  Oil Door 2
Brief Description:  Finish making Oil Door

The hinge needed a spacer between the underside of cowl and the hinge. This effectively lowers the closed door snug to the opening. .070 thick spacer tapering to .020 on the aft end. That is no doubt variable with other builds. Decided to use CS4-4 pull rivets on the hinge. The door itself was just countersunk to fit those rivets flush. The Cowl half of the hinge got recessed 6/32 tinnerman washers with the flush CS4-4s. It spreads the load a little more than just a flush countersink. If that ever causes problems, I'll just open the holes to #27 for 6/32 machine screws/all metal lock nuts..
' style=

Ready for hinge work.  The forward side (right) hinge needed spacer to properly hold the closed door.

Ready for hinge work. The forward side (right) hinge needed spacer to properly hold the closed door.

' style=

Tinnerman washers (6/32) with CS4-4 pull rivets hold the hinge in place on the cowl.

Tinnerman washers (6/32) with CS4-4 pull rivets hold the hinge in place on the cowl.

' style=

The underside view.  It is spring loaded hinge and the open/close operation is very smooth.

The underside view. It is spring loaded hinge and the open/close operation is very smooth.

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.