Brief Description: Left elevator leading edge rolling.
Finally, anothother hour of rolling leading edges on the left elevator. I started with the easy end at the tip, Rolled, deburred, then blind riveted. Easy. Then the difficult middle tabs to roll. I think by thsi time since I had done about 5 of those already it would be quick. Maybe a little faster, but this rolling stuff is still hard to do so it's not a really fast process.
Tip end of the left elevator rollend and rivietd.
Rolling the middle tabs with the broom handle and duct tape.
Looking pretty good, but more rolliing still needed.