KitLog pro

Powered By Kitlog Pro v2.0

Traci and Tom's RV-7A
' style=
Date:  11-8-2013
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Left elevator leading edge rolling.

Finally, anothother hour of rolling leading edges on the left elevator.
I started with the easy end at the tip, Rolled, deburred, then blind riveted. Easy.
Then the difficult middle tabs to roll. I think by thsi time since I had done about 5 of those already it would be quick. Maybe a little faster, but this rolling stuff is still hard to do so it's not a really fast process.
' style=

Tip end of the left elevator rollend and rivietd.

Tip end of the left elevator rollend and rivietd.

' style=

Rolling the middle tabs with the broom handle and duct tape.

Rolling the middle tabs with the broom handle and duct tape.

' style=

Looking pretty good, but more rolliing still needed.

Looking pretty good, but more rolliing still needed.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.