KitLog pro

Powered By Kitlog Pro v2.0

TAB Aircraft LLC Web Site
' style=
Date:  7-6-2012
Number of Hours:  1.00
Manual Reference:  S1- 2.1 to 9.4
Brief Description:  Page 8 Bulkhead Assembly, July 4 2012

July 4 2012 Continued.

Bulkhead Assembly Continued.
Manual Ref: S1- 2.1 to 9.4

I worked on the bulkhead lower cross tube as it got dark out side and the Neighbors across the lake started their yearly fireworks show. I had the hanger door open and could see it but did not pay much attention to it. I started the upper cross tube and then called it a night.
I took one last photo of the hanger/garage before Bill comes tomorrow and move his kit to the EAA hanger.
' style=

Building the lower cross tube

Building the lower cross tube

' style=

Starting the upper cross tube

Starting the upper cross tube

' style=

The last night with Bill's kit

The last night with Bill's kit

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.