KitLog pro

Powered By Kitlog Pro v2.0

TAB Aircraft LLC Web Site
' style=
Date:  7-8-2012
Number of Hours:  3.33
Manual Reference:  S1- 10.1 to 16.5
Brief Description:  Page 10 Bulkhead Assembly July 8 2012

July 8 2012

Bulkhead Assembly Continued.
Manual Ref: S1- 10.1 to 16.5

I connected the upper and lower bulkhead cross tubes with the left and right upright assembly and installed the diagonals. I installed my first rivet of many to come.

THE BULKHEAD IS COMPLEAT
' style=

Connecting the upper and lower cross tubes

Connecting the upper and lower cross tubes

' style=

My first rivits

My first rivits

' style=

Bulkhead completed

Bulkhead completed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.