TAB Aircraft LLC Web Site
Work Logs Found: 58
Category Work Time: 113 Hours
 Date
Hours
Work Log Summary

Details

 10-11-2014
0.00
Page 498 Repair Tail Wheel Pulley Again
Details
       

 08-20-2014
0.00
Page 497 Repair of the Tail Wheel Pulleys
Details
       

 07-30-2013
0.25
Page 295 Getting the Fuel Tank Ready
Details
       

 04-24-2013
1.00
Page 235 Installed Flap Slave Arm
Details
       

 04-24-2013
1.00
Page 234 Installed Aileron Tie Rod Tube
Details
     

 04-23-2013
0.75
Page 233 Installed Aft Boom Tube Cover
Details
       

 02-28-2013
0.50
Page 199 Securing the Rudder Cables
Details
       

 01-10-2013
1.00
Page 153 Installed the 914 Root Tube
Details
       

 01-09-2013
2.00
Page 152 Looking for stuff to do
Details
       

 12-22-2012
1.00
Page 135 Installing Bulkhead Support 3
Details
       

 12-21-2012
1.00
Page 134 Installing Bulkhead Support 2
Details
       

 12-13-2012
3.00
Page 128 Installing the Pylon Side Covers
Details
       

 12-12-2012
2.00
Page 127 Preparing the Pylon Side Covers 6
Details
       

 12-11-2012
1.50
Page 126 Replacing the damaged Side Cover
Details
       

 12-08-2012
2.00
Page 123 Preparing the Pylon Side Covers 5
Details
     

 12-07-2012
1.00
Page 122 Preparing the Pylon Side Covers 4
Details
       

 12-06-2012
1.00
Page 121 Preparing the Pylon Side Covers 3
Details
       

 12-05-2012
1.00
Page 120 Preparing the Pylon Side Covers 2
Details
       

 12-04-2012
2.00
Page 119 Preparing the Pylon Side Covers 1
Details
       

 12-03-2012
3.00
Page 118 Fitting the Pylon Side Covers
Details
       

 12-02-2012
4.00
Page 117 Making the Hole for the Flap Slave Horn
Details
       

 12-01-2012
3.00
Page 116 Installing the Pylon Side Covers
Details
       

 11-30-2012
0.50
Page 115 Caulked around the Rear Pylon Support
Details
     

 11-28-2012
2.00
Page 113 Installed Fuel Sump System
Details
       

 11-27-2012
7.00
Page 112 Installed the Splash Guard continued
Details
       

 11-26-2012
1.00
Page 111 Installation of the Hull Side Angles
Details
       

 11-25-2012
2.00
Page 110 Installation of the Splash Guard
Details
       

 11-24-2012
1.00
Page 109 Installed the Expansion Plates
Details
       

 11-23-2012
2.00
Page 108 Installation of the Expansion Plates
Details
       

 11-22-2012
4.00
Page 107 Installed the Pylon Angles
Details
       

 11-20-2012
0.00
Page 105 This don't look right
Details
       

 11-19-2012
4.00
Page 104 Installation of the Boom Tube Covers
Details
       

 11-17-2012
2.00
Page 102 Assembly of the Electric Flap Actuator
Details
       

 11-16-2012
2.00
Page 101 Attaching the Root Tube to the Supports
Details
       

 11-14-2012
2.00
Page 99 Preparing the Fuel Fill Connection Part 4
Details
       

 10-06-2012
0.00
Page 90 Preparing the Fuel Fill Connection Part 1
Details
       

 09-20-2012
0.75
Page 78 LSX Seat Hardware and Heater Hoses
Details
       

 09-19-2012
2.00
Page 76 Installing Tosten Aircraft Grips
Details
       

 08-31-2012
4.00
Page 59 Installation of the Throttle Assembly
Details
       

 08-29-2012
5.50
Page 57 Installed Tail Wheel Retraction Spring
Details
       

 08-27-2012
3.00
Page 55 Assembly of the Control Sticks
Details
       

 08-21-2012
3.00
Page 53 Assembly of the Electric Trim Actuator
Details
       

 08-19-2012
1.00
Page 51 Tail Wheel Assembly Continued
Details
       

 08-18-2012
2.00
Page 50 Tail Wheel Assembly
Details
       

 08-17-2012
2.00
Page 49 Tail Fin Assembly
Details
       

 08-16-2012
2.00
Page 48 Connecting the Elevator Push Pull Rod
Details
       

 08-15-2012
3.00
Page 47 Permanently Attaching Airframe to Hull
Details
       

 08-13-2012
3.00
Page 45 Forward Cockpit Part 2
Details
       

 07-17-2012
1.50
Page 18 Installed Fuel Level Sender
Details
     

 07-14-2012
2.00
Page 16 Installing the Rear Fuel Tank Angle
Details
       

 07-13-2012
1.00
Page 15 Fuel Tank Cleaning July 12 2012
Details
       

 07-12-2012
0.66
Page 14 Forward Fuel Tank Angle
Details
       

 07-11-2012
2.00
Page 13 Installing the Boom Tube
Details
       

 07-10-2012
3.00
Page 12 Fuselage Aft Assembly
Details
       

 07-09-2012
2.90
Page 11 Forward Cockpit Assembly July 9 2012
Details
       

 07-08-2012
3.33
Page 10 Bulkhead Assembly July 8 2012
Details
       

 07-06-2012
1.00
Page 8 Bulkhead Assembly, July 4 2012
Details
       

 07-05-2012
3.00
Page 7 The Build Begins, July 4 2012
Details
       