Brief Description: Page 72 Installing the Stow-n-Go Hatch Part 3
September 15 2012
MODIFICATION NUMBER 11
Installing the Stow-n-Go Hatch Part 3
After letting the Resin Paste setup for 2 days, I drilled out all the Rivets and removed the Turtle Deck and flipped it over to lay the Fiberglass strips on the inside flange. During the glass laying, Love Bugs that was swarming outside managed to keep getting in my wet glass work. I hate Love Bugs!!!!!!!!!!