Brief Description: Pre-rotator and Bearing support
Completed the installation of the Pre-rotator on the EJ25. However, the instruction could have provided a better sequence of assemble. I would discover that mounting the brackets to the engine first would be a mistake. They should be attached to the pre-rotator first to bolts could be inserted from the engine side.
The belt provided for the pre-rotator is too short. I will need a 1100 mm belt v.s the 1080 mm.
I finally received the bearing support insert. I was with great joy to mount the supporting structure and finish drilling the AN6 holes.